Club Penguin Rewritten Wiki
No edit summary
Tags: Visual edit apiedit
No edit summary
Tags: Visual edit apiedit
Line 33: Line 33:
 
Medieval Party 2017 Beacon-0.png|[[Medieval Party 2017]]
 
Medieval Party 2017 Beacon-0.png|[[Medieval Party 2017]]
 
Water Party 2017 Beacon.png|[[Water Party 2017]]
 
Water Party 2017 Beacon.png|[[Water Party 2017]]
  +
Beaconflight.png|[[Festival of Flight 2017]] construction
 
Screenshot 31.png|[[Festival of Flight 2017]]
 
Screenshot 31.png|[[Festival of Flight 2017]]
 
</gallery>
 
</gallery>

Revision as of 21:02, 20 August 2017

Template:RoomInfoBoxThe Beacon is the top floor of the Lighthouse, and serves, as the name implies, as a beacon to ships at sea, most notably The Migrator. Due to being so high up, it also serves as a great lookout point to see much of Club Penguin Rewritten. In addition to this, there is a telescope positioned on the railing, which allows penguins to view far off, to the sea.

While not much is located at the Beacon aside from the giant light, there is also a launch pad for penguins to play Jet Pack Adventure. The entire Beacon is surrounded by railing, with the addition of a set of stairs leading down to the Lighthouse on the left edge.

Tour Guide

The Beacon holds the Lighthouse spotlight and a telescope you can look through. And if you thought penguins could not fly, you should try the Jetpack game to the right.

Parties

2017

  • During the April Fools' Party 2017, the Beacon was hand-drawn with a pencil.
  • During the Easter Egg Scavenger Hunt 2017, one of the eggs was hidden here. To get it, the player had to turn off the light of the beacon.
  • During the Medieval Party 2017, the beacon was changed to a fireplace that would burn if the player clicked the logs. Next to the jetpack was a sign that said "Wizard's Flying Machine". A trapdoor was also placed on top of the staircase.
  • During the Water Party 2017, the Beacon features the leaves of a palm tree.
  • Before the Festival of Flight 2017 began, construction for the party was held from August 14, 2017 until August 16, 2017. Included in the area were wooden crates, a construction sign, orange cones, and the beacon itself was in the process of being deconstructed. When construction ended, the party began. Deconstruction of the Beacon was completed at this point. In place of the beacon was a massive spinning, gray propeller.

Pins

Image Pin
Feather Pin
Feather Pin
Total 1

Gallery